Project Descriptions | Industry | Year |
Supply and Fabricate MF Skid for Australia Belmont Desalination Plant (110 Asahi DCA Module x 6 Train) | Municipal | 2025 |
Supply and Fabricate the Contanerised 1 MLD RO System (4 set BWRO/ 1 set SWRO) for Philippines Iloilo Project | Municipal | 2025 |
Supply and Fabricate the SS304 MBR Module Rack for Various Project | Municipal | 2025 |
Supply and Fabricate the UF Module Rack for DCA Module for Qiddya Project | Municipal | 2025 |
Supply Labor and Consumable for fabrication of SS and CS Pipe Spools for SBUC Demin Plant | Power Plant | 2024 |
Supply and Fabricate SS316L Clarifier for Singapore TWRP Project - 5 Units | Municipal | 2024 |
Supply and Fabricate Super Duplex Tore Head for Ruya Project | Oil & Gas | 2024 |
Supply and Fabricate the Hydrophore Package for Pikka Development Project | Marine | 2024 |
Supply and Fabricate the Water Treament Skid for Taiwan Chung Chia Power Plant | Power Plant | 2024 |
Supply and Fabricate SS316L MBR Rack for Singapore TWRP Project - 723 sets | Municipal | 2024 |
Supply and Fabricate the Onsite Sodium Hypo Generator – K16 Series for TTH Project | Municipal | 2024 |
Supply and Fabricate BWRO Skid for Philippines Newton Water Reclaimation Plant (4 x 2,888 m3/ Day) | Municipal | 2023 |
Supply and Fabricate Duplex Skid and Bracket for Hong Kong MBR Project | Municipal | 2023 |
Supply and Fabricate the Onsite Sodium Hypo Generator – K8 Series for CRL Mauritius Project | Municipal | 2023 |
Supply and Fabricate the Onsite Sodium Hypo Generator – K16 Series for AOS Houston Project | Municipal | 2023 |
To supply and fabricate UF (4 sets) and RO (3 sets) Skid for Philippines Maynilad PASAY WRF WATER RECYCLING PROJECT | Municipal | 2023 |
Supply and Fabricate the Onsite Sodium Hypo Generator – M Series for Suriname Project | Municipal | 2023 |
Supply and Fabricate Duplex Skid and Bracket for Hong Kong MBR Project | Municipal | 2023 |
Supply and Fabricate the On Site Sodium Hypo Generator K4 Series (2 sets) for Hong Kong TKO Desalination Project | Domestic | 2023 |
Supply and Fabricate the Chemical Dosing Skid for Utilities & ETP Package (Total 27 Skid) | Oil & Gas | 2023 |
Supply and Fabricate the Samalaju Metering Skid (6” Ansi 600 & 10” Ansi 600). | Oil & Gas | 2023 |
Supply and Fabricate the 12” Ansi 900 RTJ Calibration Pipe Spools (20 Spools) for Korean Energy Terminal (KET) Project | Oil & Gas | 2023 |
Supply and Fabricate the Skid, Pipe Spools and Pipe Rack/ Support for Demin Plant for Taiwan Taichung Power Plant Project | Power Plant | 2023 |
To supply and fabricate the UF, RO, MB, Chemical Dosing Pump Skid and Interconnecting Pipe Spools for Indonesia Manyar Smelter Project. Total 36 Skid. | General | 2023 |
Supply and Fabricate SS316 MBR Module Rack for various Project | Municipal | 2023 |
Supply and Fabricate the Duplex Pipe Spools and Support for Sangomar Project | Oil & Gas | 2023 |
Supply and Fabricate the 6 Mo Pipe Spools and Support for Scarborough FPSO Project | Oil & Gas | 2023 |
Supply SS 316 and CS Pipe Spools & Pipe Support for Layang Field Helang FPSO Project | Oil & Gas | 2023 |
Supply and Fabricate MS Sand Bagging Frame | Oil & Gas | 2023 |
Supply and Fabricate the Gas Metering & Condensate Skid for Kasawari Gas Development Project. Gas Skid 12” Ansi 900 Meter (Skid Size: 4.5 m W x 19.5 m L x 4.1 m H) Condensate Skid: 4” Ansi 900 |
Oil & Gas | 2022 |
To provide Engineering Drawing & Supply and fabricate of: a) Pre – UF Skid – 7 sets b) Two Pass RO Skid – 5 sets c) CEDI Skid – 4 sets d) Polishing UF Skid – 2 sets |
Semiconductor | 2022 |
Supply and Fabricate the Containerized Onsite Sodium Hypo Generator – M Series for Laos Project | Municipal | 2022 |
Supply and Fabricate the Onsite Sodium Hypo Generator – K16 Series | Municipal | 2022 |
Supply and Fabricate STANDARD SONIC NOZZLE TEST BENCH for Shenyang Project | Oil & Gas | 2022 |
Supply and Fabricate the Pipe Spools; Skid; Pipe Rack and Support for Matarbari CPP Package | Power Plant | 2022 |
Supply and Fabricate the SS304 Module Rack for Model 56M2400FF to Mexico (24 sets) and Malaysia (2 sets) Project | Domestic | 2022 |
Supply and Fabricate the #1500 Pipe Spools for Petronas Bunga Raya Retrofit Project | Oil & Gas | 2022 |
Supply and Fabricate the SS316L Tore Head | Oil & Gas | 2022 |
Supply and Fabricate the Super Duplex Tore Head | Oil & Gas | 2022 |
Supply and Fabricate the Heat Exchange Skid with Piping for Helang FPSO Project | Oil & Gas | 2022 |
Supply and Fabricate the SS304 Module Rack for Model 50M0500FF to Bangkok (3 sets) and 56M1200FF & 56M0800FF to UAE (2 sets) Project | Municipal | 2022 |
Supply and Fabricate the SS304 Module Rack for Model 50M; 56M & 57M for various project (14 sets) in Poland, Greece, Mexico, Brazil and UK Project. | Municipal | 2022 |
Supply and Fabricate the Skid, Pipe Spools and Pipe Rack/ Support for Demin Plant for Taiwan Hsinta Power Plant Project | Power Plant | 2022 |
Supply and Fabricate the 16” Ansi 600 RTJ Calibration Pipe Spools (8 Spools) for Thailand Project | Oil & Gas | 2022 |
To provide labour and tools for Site Installation Works. Project: Wastewater Treatment Plant for Intel Pelican, Penang with the following scope of supply: a) Fabrication of PP; PVDF; PVC and FMPVC Pipe Spools. b) Mover for Positioning of Equipment c) Fabrication of Pipe Rack and Platform d) Fabrication of Pipe Rack & Support e) Site Installation Works f) Fabrication of PP Valve and Dosing Pump Box |
Semiconductor | 2022 |
Supply and Fabricate the UF Skid (3 Train) and Chemical Dosing Skid (18 Skid) for Water Treatment Project for Matarbari Power Plant | Power Plant | 2021 |
Interconnection Pipe Spools fabrication work for Water Treatment Project for Matarbari Power Plant | Power Plant | 2021 |
Supply and Fabricate Turbine Metering Skid for GPD 2500MW PLUK DAENG POWER PLANT PROJECT, THAILAND | Power Plant | 2021 |
Supply and Fabricate the SIE Phase 7 Metering Skid for of Metering and Pressure Reduction Modules for Existing Tuen Mun Station, Hong Kong. | Oil & Gas | 2021 |
Supply and Fabricate the On Site Sodium Hypo Generator K8 Series (2 sets) for Korea Namyangju & Chungju Project | Municipal | 2021 |
Supply and Fabricate the Asahi UF Module Rack for 50 MLD Water Reclamation Plant for Cairo New Capital Project | Municipal | 2021 |
Supply and Fabricate the SS316/ SS304 MBR Module Rack for various project in Spain, Egypt, Turkey, Malaysia, Mexico & etc.. | Municipal | 2021 |
Supply and Fabricate the SS316 MBR Rack | Chemical | 2021 |
Supply and Fabricate Ansi 600 CS Spools for Gas Metering System. | Power Plant | 2020 |
Supply and Fabricate Metering Skid for Caiyu Nozzle Test Bench Project | Oil & Gas | 2020 |
Supply and Fabricate the SS 304 MBR Skid for Peru Water Reclamation Plant (20 skids) | Domestic | 2020 |
Supply and Fabricate the SS 316 MBR Skid Header | Domestic | 2020 |
Supply and Fabricate the On Site Sodium Hypo Generator K6 Series with Capacity of 500 kg/ Day for Korea Ilsan Project. | Domestic | 2020 |
Supply and Fabricate the LTCS Pipe Spools for KNPC 4 Replacement Job | Oil & Gas | 2020 |
Supply of Metering and Pressure Reduction Modules for Existing Tuen Mun Station, Hong Kong. | Oil & Gas | 2020 |
Supply and Fabricate the Condensate Carbon Filter Skid x 2 set | Chemical | 2020 |
Piping Replacement Project for Methane Alison Victoria. Fabrication of the CS Pipe Spools for the PE Coating Process (App. 8,000 Dia. Inch). | Marine | 2020 |
Supply of SS 316L Pipe Spools for FPSO Helang Tore OVD project | Oil & Gas | 2020 |
Supply and Fabricate the Chemical Dosing Skid GE India Unique Project | Chemical | 2020 |
Supply and Fabricate the Chemical Injection Skid for Kasawari Gas Development Project | Oil & Gas | 2020 |
Supply and Fabricate the SS 304 MBR Skid for Thailand Water Reclaimation Plant (10 skids) | Municipal | 2020 |
Supply and Fabricate the SS 316 MBR Skid for Jurong WRP membrane replacement project (78 skids) | Municipal | 2020 |
Supply and Fabricate of Pipe Spools, Pipe Support and Skid Assembly Works for Cirebon CPP and WWTP Project | Power Plant | 2020 |
Supply and Fabricate the SS Structural Support for Korea Godeok MBR Project (88 Sets) | Municipal | 2020 |
Supply and Fabricate of Chemical Dosing Pump Skid (7 Skid) for Lotte Riau Power Plant Project | Power Plant | 2020 |
Supply and Fabricate of Pipe Spools, Pipe Support, Skid and Assembly Works for Jawa 1 CPP Project | Power Plant | 2020 |
Piping Replacement Project for Taitar 4. Fabrication of the CS Pipe Spools for the PE Coating Process (App. 10,000 Dia. Inch). | Marine | 2020 |
Supply and Fabricate the Piping and Steel Structural Works for Tanjung Jati B 5 & 6 Condensate Polisher Plant for Power Plant Project | Power Plant | 2019 |
Supply and Fabricate of Pipe Spools, Pipe Support and Skid Assembly Works for IFFCL 2 Project (12,000 Dia Inch and 15 Tonnes) Trial Fix the MMF and CPP Polisher System Electrical & Instrumentation Works |
Chemical Plant | 2019 |
Supply and Fabricate a 40 foot Containerized Demin System for TAMBAK LOROK CCPP BLOCK 3 PROJECT | Power Plant | 2019 |
Supply of Gas Metering Skid for Kinyerezi II Gas Power Plant Project | Power Plant | 2019 |
Site Installation and Commissioning Supervision Services for Egypt Port Said SWRO Plant (For Asahi MF System) | Municipal | 2019 |
Supply and Fabricate the Gas Metering Skid – 2 System for UAE Layyah TM Package | Power Plant | 2019 |
Supply and Fabricate UF Valve Unit Rack (22 sets) with assembly works (Pipe Spools supplied by customer) for Jurong Island Desalination Plant. | Domestic | 2019 |
Supply and Fabricate the Gas Metering Skid – 4 System for Gulf Sriracha Project | Power Plant | 2019 |
Indonesia Jawa 2 – CCCP Project MBE Skid and related interconnecting pipe spools & support |
Power Plant | 2018 |
Electrocholorination Skid for Chestnut Avenue Water Works (4 Skid) | Municipal | 2018 |
Supply and Fabricate the Oil & Fuel Metering Skid – 23 sets Including the Full Flow Test with flowrate of 1,250 cmh and 2,500 cmh |
Oil & Gas | 2018 |
Philippines Containerized BWRO System for 13 MLD WWT Plant (40’ Container) – 3 set | General | 2018 |
Supply and Fabricate the Gas Metering Skid – 9 System Including the Full Flow Test with flowrate of 1,200 cmh | Oil & Gas | 2018 |
Supply and Fabricate the Gas Metering Skid – 2 System for Turakurgan Project | Power Plant | 2018 |
Pipe Support and HDPE Interconnecting Pipe Spools for Indonesia Central Jawa CPP Plant | Power Plant | 2018 |
Fabrication of RO Skid for Springvale MPPS Project (53 PV/ Skid) – 5 Skid | Power Plant | 2018 |
Chemical Dosing Skid and Pipe Support for Tanjong Jati 5 & 6 Wastewater Treatment Plant | Power Plant | 2018 |
Supply and fabricate the Water Treatment Skid, Pipe Rack and Interconnecting Piping for Pasir Gudang Track 4A Power Plant. | Power Plant | 2018 |
MBR Pilot Plant @ Jurong Island To supply a Skid Mounted MBR Pilot Plant with Ozonation as cleaning process – 72 m3/ Day |
Municipal | 2017 |
Indonesia Central Jawa 2 x 1000 MW Coal Fired Power Plant Project. To supply and Fabricate a) SWRO Skid @ 320 m3/Hr (Feed Flow) x 3 skid b) BWRO Skid @ 95 m3/Hr (Feed Flow) x 2 skid c) Chemical Dosing Skid – 8 skid |
Power Plant | 2017 |
Lontar Extension (Coal Fired Steam Power Plant). a) To Supply and Fabricate b) Interconnecting Pipe Spools c) Pipe rack/ Support d) Chemical dosing Skid |
Power Plant | 2017 |
Rapid Project – Package 14 Utilities Plant a) Fabrication and Assembly of Valve Station Skid for Demin Plant (24 Skid) b) Fabrication and Assembly of UF Skid for Demin Plant (15 Skid) c) Fabrication and Assembly of Chemical Dosing Skid (22 Skid) – Included the 100 % RT and PWHT CS Pipe Spools d) Interconnecting Pipe Spools fabrication |
Oil & Gas | 2017 |
Philippines Amkor Technology 500 usgpm UPW System Supply and Fabrication of 3 Two Pass RO Skid, Chemical Dosing Skid and ROCIP Skid |
Semiconductor | 2016 |
Malaysia LNG Restoration of Boiler Feed Water Capacity Project Supply and Fabricate the CS Pipe Spools for the interconnecting CSRL Pipe – 8,000 Dia-inch | Oil & Gas | 2016 |
Algeria Megadeal CCPP Plant Supply and fabrication of Pipe Spools and Skidded System for DM and WWTP System |
Power Plant | 2016 |
Hypocholorite Generation Package for FPSO | Oil & Gas | 2016 |
Thailand Mae Moh Power Plant Unit 4 – 7 Replacement Project Supply and Fabrication of various MF, RO, CEDI, Chemical Dosing Skid (20 Skid) for Demineralization Plant Interconnecting Piping System for Demin Plant. Type of Piping Materials: CPVC, SS, HDPE and GRE. |
Power Plant | 2016 |
Indonesia Banggai Ammonia Plant (BAP) Project Supply and Fabricate SWRO Skid (3 sets), BWRO Skid (3 sets) and Inge MF System Valve Unit (3 sets) |
Chemical Plant | 2016 |
Philippines Amkor Technology 150 usgpm UPW System Supply and Fabrication of a Two Pass RO Skid and ROCIP Skid |
Semiconductor | 2016 |
Jurong Rock Cavern Phase 1 Project MMF Filtration Unit a) MMF Feed Pump Skid c/w GRV Pipe b) MMF Backwash Pump Skid c/w GRV Pipe c) Off Spec. Skid c/w GRV Pipe d) Air Blower Skid c/w GI Pipe |
Oil & Gas | 2016 |
Taiwan Talin Renewal Project (Phase II) a) Supply and fabrication of pipe spools, pipe rack (30 tonnes) and assembly works (SS/ CS: 22,000 Dia Inch) b) Trial Fix the Condensate Polisher System |
Power Plant | 2015 |
Kinabalu NAG Development Project a) To supply and fabricate the Wash Water Injection System b) To supply and fabricate the HPHT Flowline Scale Inhibitor Injection System |
Oil & Gas | 2015 |
Construction of Desalination and Power Plant – Yanbu Phase III a) To supply and Fabricate the Pipe Rack and Support b) To fabricate the Pre – Fab SS and CS Spools for Demin Plant |
Power Plant | 2015 |
Changi NEWater Project II To supply and fabricate the MF Skid with 220,000 m3/ Day output NEWater Plant: a) Details Engineering for Mechanical Drawing b) MF Skid Frame x 12 sets c) HDPE Piping within the Skid c/w Various Valve d) Instrumentations and Control e) Site Installation Supervison and Comissioning |
Municipal | 2015 |
MBR Pilot Plant @ CWRP To supply a Containerized MBR Pilot Plant with Ozonation as cleaning process – 2 m3/ Day |
Municipal | 2015 |
Permas Field Substructcture, Topside & Pipeline Project a) Supply and fabrication of Chemical Injection Package (A – 6810 & A – 6860) b) Fabrication of SS Storage Tank (Rectangular), SS Pipe Spools and Skid Structural Works. |
Oil & Gas | 2014 |
Taiwan Talin Renewal Project (Phase I) a) Supply and fabrication of pipe spools, pipe rack (30 tonnes) and assembly works (SS/ CS: 22,000 Dia Inch) b) Trial Fix the Condensate Polisher System |
Power Plant | 2014 |
Nigeria Fertilizer Project a) Supply and Fabricate of Pipe Spools, Pipe Support and Assembly Works (12,000 Dia Inch and 15 Tonnes) b) Trial Fix the MMF and Polisher System c) Electrical & Instrumentation Works |
Chemical Plant | 2014 |
ARL Upgrading Project a) Supply and Fabricate of RO Skid (Mechanical & Electrical Works) – 2 sets b) Chemical Dosing Skid (5 Sets with CPVC piping) c) RO CIP Skid |
Oil & Gas | 2014 |
Malikai EPC TLP Project a) Supply and Fabricate the Hot Water Skid b) Supply and Fabricate the Structural Base c) Supply and Fabricate the Copper Piping System within the Skid |
Oil & Gas | 2014 |
Rabigh Phase II Petrochemical Project To Supply and Fabricate the SS Pipe Spools and Structural Support for Remin System |
Oil & Gas | 2014 |
Kimanis CCP Project: a) Engineering Works b) Supply of Pressure Vessel and Accessories c) Chemical Skid for Demin System Fabrication d) HDPE Pipe Spool – Supply & Fabrication e) Site Installation Works for the Demin Plant f) Site Installation of Electrochlorination Plant |
Power Plant | 2013 |
Bintulu MLNG Project: Supply of Chemical Dosing Skid for MLNG Malaysia (4 Skid with PVDF Piping and 4 Skid with SS 316L Skid) |
Oil & Gas | 2013 |
Philippines Therma South Energy Unit 1 & 2 Project: a) Supply and fabrication of UF Skid x 2 nos and RO skid x 2 nos b) Supply and Fabrication of 12,000 D-Inch Interconnecting Piping (CSRL, SS) and Pipe Rack (35 Ton) |
Power Plant | 2013 |
Givaudan Project for Supply and Fabricate UF and RO Skid | F & B | 2013 |
MARC Project (RWS Marine Life Park) Site Installation for Water Treatment Plant of Marine Research Centre |
General | 2012 |
GMR Project RO Skid, UF Skid, Chemical Dosing Pump Skid Fabrication and Site Installation works for 20 cmh RODI Demin Plant |
Power Plant | 2012 |
SUT Project (Sembcorp Multi-Utilities Facility): a) CSRL Pipe Spools fabrication for SUT Demin Plant b) 18,000 D-Inch SS and CS Spools Fabrication c) Supply and Fabrication of GI Bolted Type Pipe Rack (40 tonnes) d) Site Installation of Demin Plant |
Power Plant | 2012 |
Vung Ang 1 Thermal Power Project. Supply and Fabricate: SS Pipe Spool Fabrication Chemical Dosing Skid x 4 sets |
Power Plant | 2011 |
Flextronics System Relocation: 25 usgpm Portable Demin System Relocation and Pipe Spool Fabrication |
Semiconductor | 2011 |
Isabella Project: RO Skid Fabrication and Assembly (3 x 175 cmh) |
General | 2011 |
Flextronics System Relocation Project 60 usgpm RODI Plant relocation (PVDF Pipe Spools Fabrication) |
Semiconductor | 2011 |
Tuas Multi-utilities Complex Project (TMUC): SS Pipe Spools Fabrication (11,000 Dia. Inch) |
Power Plant | 2011 |
Keppel Merlimau Cogen Project (75 cmh Demin. Plant): CPVC and SS Pipe Spool Fabrication Pipe Rack Fabrication Site Installation |
Power Plant | 2011 |