Project Title | Industry | Completion |
Piping Replacment Project- Methane Alison Voctoria; CS Pipe Spools for PE Coating Process (8,000 dia inch) | Marine | Aug 2020 |
Supply and Fabricate Long Son Condensate Carbon Filter Skid x 2 nos | Petrochemical | September 2020 |
Supply and Fabricate Chlorine Generator Skid (500kg/ Day) | Domestic | November 2020 |
Supply and Fabricate SS316 MBR Skid Header | Domestic | July 2020 |
Supply and Fabricate SS304 MBR Skid for Peru Water Reclamation Plant (20 skids) | Domestic | June 2020 |
Supply and Fabricate Metering Skid for Caiyu Nozzle Test Bench Project | Oil & Gas | June 2020 |
Piping Replacement Project for Taitar 4. Fabrication of the CS Pipe Spools for the PE Coating Process (App. 10,000 Dia. Inch). | Marine | January 2020 |
Supply and Fabricate of Pipe Spools, Pipe Support, Skid and Assembly Works for Jawa 1 CPP Project | Power Plant | April 2020 |
Supply and Fabricate of Chemical Dosing Pump Skid (7 Skid) for Lotte Riau Power Plant Project | Power Plant | January 2020 |
Supply and Fabricate the SS Structural Support for Korea Godeok MBR Project (88 Sets) | Power Plant | January 2020 |
Supply and Fabricate of Pipe Spools, Pipe Support and Skid Assembly Works for Cirebon CPP and WWTP Project | Power Plant | Apr 2020 |
Supply and Fabricate the SS 316 MBR Skid for Jurong WRP membrane replacement project (78 skids) | Domestic | March 2020 |
Supply and Fabricate the Gas Metering Skid – 4 System for Gulf Sriracha Project | Power Plant | August 2019 |
Supply and Fabricate UF Valve Unit Rack (22 sets) with assembly works (Pipe Spools supplied by customer) for Jurong Island Desalination Plant. | Domestic | July 2019 |
Supply and Fabricate the Gas Metering Skid – 2 System for UAE Layyah TM Package | Power Plant | June 2019 |
Site Installation and Commissioning Supervision Services for Egypt Port Said SWRO Plant (For Asahi MF System) | Domestic | Ongoing |
Supply of Gas Metering Skid for Kinyerezi II Gas Power Plant Project | Power Plant | May 2019 |
Supply and Fabricate a 40 foot Containerized Demin System for TAMBAK LOROK CCPP BLOCK 3 PROJECT | Power Plant | April 2019 |
Supply and Fabricate of Pipe Spools, Pipe Support and Skid Assembly Works for IFFCL 2 Project (12,000 Dia Inch and 15 Tonnes) Trial Fix the MMF and CPP Polisher System Electrical & Instrumentation Works |
Fertilizer plant | June 2019 |
Supply and Fabricate the Piping and Steel Structural Works for Tanjung Jati B 5 & 6 Condensate Polisher Plant for Power Plant Project | Power Plant | March 2019 |
Chemical Dosing Skid and Pipe Support for Tanjong Jati 5 & 6 Wastewater Treatment Plant | Power Plant | July 2018 |
Fabrication of RO Skid for Springvale MPPS Project (53 PV/ Skid) – 5 Skid | Power Plant | September 2018 |
Pipe Support and HDPE Interconnecting Pipe Spools for Indonesia Central Jawa CPP Plant | Power Plant | June 2018 |
Supply and Fabricate the Gas Metering Skid – 2 System for Turakurgan Project | Power Plant | March 2018 |
Containerized BWRO System for 13 MLD WWT Plant (40’ Container) – 3 set |
General Industrial | April 2018 |
KNPC Project Supply and Fabricate the Oil & Fuel Metering Skid – 23 sets
Including the Full Flow Test with flowrate of 1,250 cmh and 2,500 cmh
|
Oil & Gas | May 2018 |
Electrocholorination Skid for Chestnut Avenue Water Works (4 Skid) | Water Works | June 2018 |
Indonesia Jawa 2 – CCCP Project MBE Skid and related interconnecting pipe spools & support |
Power Plant | January 2018 |
Lontar Extension (Coal Fired Steam Power Plant) To Supply and Fabricate a) Interconnecting Pipe Spools b) Pipe rack/ Support c) Chemical dosing Skid |
Power Plant | August 2017 |
Central Jawa 2 x 1000 MW Coal Fired Power Plant Project To supply and Fabricate a) SWRO Skid @ 320 m3/Hr (Feed Flow) x 3 skid b) BWRO Skid @ 95 m3/Hr (Feed Flow) x 2 skid c) Chemical Dosing Skid – 8 skid |
Power Plant | July 2017 |
MBR Pilot Plant To supply a Skid Mounted MBR Pilot Plant with Ozonation as cleaning process – 72 m3/ Day |
Municipal | April 2017 |
Jurong Rock Cavern Phase 1 Project MMF Filtration Unit a) MMF Feed Pump Skid c/w GRV Pipe b) MMF Backwash Pump Skid c/w GRV Pipe c) Off Spec. Skid c/w GRV Pipe d) Air Blower Skid c/w GI Pipe |
Oil & Gas | December 2016 |
Amkor Technology 150 usgpm UPW System Supply and Fabrication of a Two Pass RO Skid and ROCIP Skid |
Semiconductor Industrial | August 2016 |
Banggai Ammonia Plant (BAP) Project Supply and Fabricate SWRO Skid (3 sets), BWRO Skid (3 sets) and Inge MF System Valve Unit (3 sets) |
Chemical Plant | July 2016 |
Mae Moh Power Plant Unit 4 – 7 Replacement Project Supply and Fabrication of various MF, RO, CEDI, Chemical Dosing Skid (20 Skid) for Demineralization Plant Interconnecting Piping System for Demin Plant. Type of Piping Materials: CPVC, SS, HDPE and GRE |
Power Plant | August 2016 |
Hypocholorite Generation Package for FPSO | FPSO | August 2016 |
Algeria Megadeal CCPP Plant Supply and fabrication of Pipe Spools and Skidded System for DM and WWTP System |
Power Plant | August 2016 |
Amkor Technology 500 usgpm UPW System Supply and Fabrication of 3 Two Pass RO Skid, Chemical Dosing Skid and ROCIP Skid |
Semiconductor Industrial | February 2016 |
Yanbu Power & Desalination Plant – Phase 3 Pipe Spools and Chemical Skid System |
Power Plant | June 2016 |
MBR Pilot Plant To supply a Containerized MBR Pilot Plant with Ozonation as cleaning process – 2 m3/ Day |
Municipal | December 2015 |
Changi NEWater Project II To supply and fabricate the MF Skid with 220,000 m3/ Day output NEWater Plant Scope of Supply: -Details Engineering for Mechanical Drawing -MF Skid Frame x 12 sets -HDPE Piping within the Skid c/w Various Valve -Instrumentations and Control |
Municipal | December 2015 |
Construction of Desalination and Power Plant – Yanbu Phase III -To supply and Fabricate the Pipe Rack and Support -To fabricate the Pre – Fab SS and CS Spools for Demin Plant |
Power Plant, Saudi | July 2015 |
Rabigh Phase II Petrochemical Project To Supply and Fabricate the SS Pipe Spools and Structural Support for Remin System |
Oil & Gas, Saudi | July 2014 |
ARL Upgrading Project -Supply and Fabricate of RO Skid (Mechanical & Electrical Works) – 2 sets -Chemical Dosing Skid (5 Sets with CPVC piping) -RO CIP Skid |
Oil & Gas, Pakistan | August 2014 |
Talin Renewal Project (Phase II) -Supply and fabrication of pipe spools, pipe rack (30 tonnes) and assembly works (SS/ CS: 22,000 Dia Inch) -Trial Fix the Condensate Polisher System |
Power Plant, Taiwan | Jun 2015 |
Fertilizer Project -Supply and Fabricate of Pipe Spools, Pipe Support and Assembly Works (12,000 Dia Inch and 15 Tonnes) -Trial Fix the MMF and Polisher System -Electrical & Instrumentation Works |
Fertilizer Plant, Nigeria | July 2014 |
Talin Renewal Project (Phase I) -Supply and fabrication of pipe spools, pipe rack (30 tonnes) and assembly works (SS/ CS: 22,000 Dia Inch) -Trial Fix the Condensate Polisher System |
Power Plant, Taiwan | July 2014 |
Givaudan Project -Supply and Fabricate UF and RO Skid |
Food and Beverage, Indonesia | November 2013 |
Therma South Energy Unit 1 & 2 Project -Supply and fabrication of UF Skid x 2 nos and RO skid x 2 nos -Supply and Fabrication of 12,000 D-Inch Interconnecting Piping (CSRL, SS) and Pipe Rack (35 Ton) |
Power Plant, Philippines | November 2013 |
SUT Project (Sembcorp Multi-Utilities Facility) -CSRL Pipe Spools fabrication for SUT Demin Plant -18,000 D-Inch SS and CS Spools Fabrication -Supply and Fabrication of GI Bolted Type Pipe Rack (40 tonnes) -Site Installation of Demin Plant |
Demin System for Power Plant, Singapore | September 2012 |
GMR Project -RO Skid, UF Skid, Chemical Dosing Pump Skid Fabrication and Site Installation for 20 cmh RODI Demin Plant |
Demin System for Power Plant, Singapore | October 2012 |
MARC Project (RWS Marine Life Park) -Site Installation for Water Treatment Plant of Marine Research Centre |
Marine Aquaculture Research Center, Singapore |
April 2012 |
Keppel Merlimau Cogen Project (75 cmh Demin. Plant) -CPVC and SS Pipe Spool Fabrication -Pipe Rack Fabrication -Site Installation |
Demin System for Power Plant, Singapore | December 2011 |
Tuas Multi-utilities Complex Project (TMUC) -SS Pipe Spools Fabrication (11,000 Dia. Inch) |
Demin System for Power Plant, Singapore | December 2011 |
Flextronics System Relocation -60 usgpm RODI Plant relocation (PVDF Pipe Spools Fabrication) |
Semiconductor, Malaysia | October 2011 |
Isabella Project -RO Skid Fabrication and Assembly (3 x 175 cmh) |
Chemical Plant, Philippines | July 2011 |
Flextronics System Relocation -25 usgpm Portable Demin System Relocation and Pipe Spool Fabrication |
Semiconductor, Malaysia | March 2011 |
Vung Ang 1 Thermal Power Project -SS Pipe Spool Fabrication -Chemical Dosing Skid x 4 sets |
Demin System for Power Plant, Vietnam | Jan 2011 |